Hi Sanjeev,

 

I am replying your query.

 

I come accross following queries.

1. If Ee is not at work showing warning message ---- this need tobe changed to Error Msg

- User operation COLERXXE (XX=message no)

2. If Ee is punched for half day then there is no error message while Time Evaluation.

- System is not giving error. It's giving the information message.

3. Payroll is processing Even if time events are not maintained

- Payroll will run even you have n't run time evaluation.

4. While time Evaluation Shift timings are not considering or mathcing with punch timings ( ie.,accepting any time in/out)-

That can be deviation as per schedule. Ask to client what they want for this.

5. while processing payroll system should check both IT2011 and 2001 if there is no data for any day then system should throw error.

In payroll driver there have no such possiblity to check IT2011 entry. You can check IT2001 and based on that can give the error.

6. we have some grace timings for in punch and limits for early exits.

- Dosign the PCR accordingly.

 

 

Hope so you understood.

 

Regards,

Sankarsan