Hi,
Does anybody have info on the number of days in the monthly lot sizing strategies MB, M2, M3 and M4 in the ECC material master?
Thanks,
Sandy
Hi,
Does anybody have info on the number of days in the monthly lot sizing strategies MB, M2, M3 and M4 in the ECC material master?
Thanks,
Sandy