Hi All,
I have a Purchase Order and with delivery dates determined as shown below
Z1 Del Date - Pick up 09.12.2013
Z2 ASN Required by Date 02.12.2013
Z3 Ackn Date - Pick up 30.12.2013
AB Order Acknowledgment 20.01.2014
I want to find the logic how these dates are calculated. I found the below when i browsed in documents.
- Z1 =P.O Delivery Date – Transit Time
- Z2 =Z1 – Transportation Lead Time
How to find this Transit time and Transportation lead time?
Kindly let me know.
Thanks in advance.