Hi Team,
In SPRO, we have strategy group which comprises of main strategy & strategies. Assume that i have maintained the main strategy as "10- Make to Stock" & the other strategy as "40- Planning with final assembly". And the strategy group as "ZS". And i am assigning this ZS in material master. How does it will work?
Thanks